Responsibility:
1.To design the physical flows of the warehouses and internal movements of the materials in the plant. 2.To calculate the warehouse for components and other necessary resources. 3.To design and standardize the routes of the supplying trains. 4.To design and standardize the management of expedition with preloads. 5.To study the impact of each new project in the flow of materials of the plant: to recalculate warehouse, trains and stocks standing up of line. 6.To apply Just in Time principles & tools: increase frequency (train & milk runs), inventory management (flat stock), Pull system (applying Kanban, Logistics Sequencer), Value stream analysis. 7.To organize, manage, monitor and control all physical flows of the site, as well as the external warehouses monitored by the site, from raw materials, components and empty boxes to end items, including transport, reception, storage, order preparation and shipments according to FLS principles. 8.To assure all data regarding to any physical flow is properly inform in BPCS. Requirement: University degree, mainly in Business Sciences or Engineering 3 years in a similar position Advanced English level (Proficiency Level) Specialized studies in logistics and production. Planning and stocks management techniques (MRP, JIT). Well experience on flows management (Kan ban) and lean manufacturing If you are interested in this job, please be free to contact us by ficosa.shanghai@ficosa.com |